The CAT A refurbishment of this iconic building started with stripping the building back to shell and core. Saracen then set about the installation of an entirely new mechanical system including new VRV air conditioning, air handling plant and passenger lifts.

A new Dali addressable lighting system was installed to complement a range of other energy efficient systems. New bathroom facilities were installed across each of the four floors including the latest sensing sanatory ware and Dyson dryers.

In addition, Saracen extended the fabric of the building to increase the occupiable footprint to maximise the potential rent.

Saracen has shown complete commitment and dedication to this project from the start.
We were highly impressed by the designs that were presented to us in the first instance.
Since then, the relationship has been firmly cemented by hard work and an ability to think quickly and problem solve by the team on the ground.
They’ve been incredibly professional and sensitive to the environment that they are working in and we are confident we chose the best partner to see this project through.
 
Daniel Berko, Head of Property, Aspect Property Group